|
LOCUM MANAGEMENT
If you are finding it difficult to recruit senior managers, or existing staff are absent, DCB Associates can provide temporary staff to fill these key positions.
PROJECT IMPLEMENTATION
Whether short, medium or long term, DCB Associates can provide managers to co-ordinate specific projects, ranging from simple applications to complex initiatives.
WASTE ELIMINATION
Using "Activity Based Costing" techniques, DCB Associates can identify value-added operations from cost-adding and draw up a programme for their elimination.
METHOD ORGANISATION
Employing standard industrial engineering techniques DCB Associates can study existing processes, analyse current methods and implement organisational improvements.
MANPOWER OPTIMISATION
Classical method & time study techniques can be used to determine correct manning levels both from a headcount and employee profile point-of-view.
PRODUCTIVITY IMPROVEMENT
Operations from single cells to complete production processes can be studied, analysed and improved.
QUALITY ASSURANCE
Interpretation and application of quality methods, techniques and systems ranging from reject reduction through to complete implementation of ISO 9000 can be undertaken.
SYSTEMS DESIGN
A wide range of operational systems can be designed and installed, examples of which are :- production scheduling, inventory reduction, quick changeover technology, conservation of energy & materials, preventive maintenance schedules, skills matrices & cross-training of personnel, to name but few....
|
|